BMA Chlorinated Rubber Paint container

BMA Chlorinated Rubber Paint

Product code 1BM-CRP·Catalog name: Special Coatings

A versatile, high-build, easy-to-apply, single-pack chlorinated rubber-based paint with excellent resistance to chemicals in damp environments.

Roller · Spray

ISO 9001:2015 · ISO 45001:2018 · ISO 14001:2015

Key specifications

Coverage4.4–6.6m²/L, theoretical
Dry film50–75µm recommended
Touch dry30 min–1 hsurface touch dry
Recoat24–48 hdry to over coat
VOC575.85g/L

What it's used for

Road markings, parking and pedestrian crossings
Traffic signs and restrictions
Industrial floor markings for factories and warehouses
Emergency and fire exits
Swimming pools

About BMA Chlorinated Rubber Paint

BMA Chlorinated Rubber Paint is a versatile, high-build, easy-to-apply, single-pack chlorinated rubber-based paint. This high-build coating offers excellent resistance to chemicals in damp environments. Its water resistance and anti-skid properties make it ideal for environments exposed to industrial and natural acids.

Performance

  • Low-temperature flexibility
  • Excellent durability
  • Resistance to water, UV, chemicals, alkalis, fungi and high abrasion
  • Easy-to-apply one-component material
  • Excellent adhesion to all types of substrates, including concrete and asphalt

Technical specifications

Data for BMA Chlorinated Rubber Paint

ParameterNorm / standardResult
Total Solids, by weight (%) ASTM D125960
Total Solids, by volume (%) ISO 323333
Viscosity at 25 °C (KU) ASTM D562115
Specific Gravity (g/cm³) ASTM D14751.2
Total Volatile Organic Compound (VOC) (g/L) ASTM D3960575.85
Theoretical Spreading Rate (m²/L) —4.4–6.6
Recommended WFT (µm) (2) —100–150
Recommended DFT (µm) (1) —50–75
Gloss Level (%) —Matt
Appropriate solvent —Xylene
Solvent ratio by volume (%) —20–30
  • (1) DFT: Dry Film Thickness
  • (2) WFT: Wet Film Thickness

How much do you need?

Coats
123
You'll need about15.2–22.7 LTheoretical spreading rate 4.4–6.6 m²/L at the recommended 50–75 µm dry film

How to apply

Before you startHumidity ≤ 75%5 °C – 35 °CWell-ventilated area
1Surface preparation

Before applying BMA Chlorinated Rubber Paint, complete all necessary pretreatment. The surface should be clean, dry and free of all contaminants (oils, dust, dirt, etc.) to avoid the risk of surface failure.

2Steel surfaces

For new steel, clean any oil or grease residues from the surface using SAMA chemical 3 in 1 phosphating additive (1L:35L water). Sand the substrate to Sa 2½ until smooth, then remove all sanding dust and let it dry before applying any primer. For painted steel, remove loose and peeling paint by mechanical methods such as sanding or sandblasting the entire surface until smooth, so the new coating can adhere properly. When the old paint is compatible with the new one, only light sanding is required. Then remove persistent dirt, sanding residues and zinc salts with a detergent solution and water. For non-ferrous metal (galvanized steel, aluminum, stainless steel, etc.), remove corrosion residues and, to promote adhesion of the subsequently applied coatings, use a thin layer (8–10 µm) of BMA Wash Primer to etch the substrate. If the surface is unetched or etching is not possible, sweep or brush blast clean it with a non-metallic abrasive to lightly roughen the surface. Let the surface dry before coating application. To even out surface unevenness, apply BMA putty polyester. For corrosion prevention, prime the cleaned surface directly.

3Concrete surfaces

Prepare the concrete substrate well to avoid any coating defects. For a new surface, ensure the concrete is completely cured for at least 30 days. For both fresh and old concrete, decontamination is required to remove any dust, oil, grease, laitance, fatty acids or other contaminants. Acid etching with Acid Solution is recommended; decontamination can also be done by detergent scrubbing, low-pressure water cleaning or steam. Rinse well with water after acid etching. After cleaning, fill and repair any surface irregularities (cracks, holes and pores) with the cementitious mixture. To prepare the cementitious mixture, first make an SBR Solution by mixing BMA SBR with water (1:5 by volume), then add the SBR Solution to the cement and sand until you reach the desired cementitious mixture. BMA puttypoxy can be used to repair light scratches. Allow the concrete substrate to dry, then check its moisture and pH. Ensure the pH is between 6 and 9, since alkalinity can affect and destroy paint adhesion. Make sure the moisture content does not exceed 4% (by weight); otherwise, the concrete surface is not a good candidate for painting.

4Priming

BMA Chlorinated Rubber Paint is a self-priming product.

5Thinning

Thinning is required for spray application: add 20–30% xylene by volume for the first layer and 10% for the second layer.

6Application

Apply BMA Chlorinated Rubber Paint in a well-ventilated area where the humidity does not exceed 75% and the temperature is between 5 °C and 35 °C.

  1. Spray: Can be sprayed or applied with a mohair roller on a clean, dry surface.
  2. Number of coats: Two coats are usually required. Applying three coats is not recommended.
  3. Reflectiveness (night visibility): Glass beads can improve the night visibility of road markings. Spread the glass beads uniformly by the drop-on method onto the wet paint immediately after application. Adding glass beads also increases the abrasion resistance of the applied coating.
  4. Ventilation (enclosed areas): When coating in an enclosed area, use forced ventilation to help remove solvent fumes from the coating, let it dry and create a safer environment for workers.

Drying times

  1. Surface Touch Dry30 min–1 h
  2. Through Dry2 h
  3. Dry to over coat24–48 h

Use it with

The products this coating is specified alongside in the data sheet.

Putty

BMA putty polyester

Evens out surface unevenness on metal.

Putty

BMA puttypoxy

Repairs light scratches in concrete.

Etch primer

BMA Wash Primer

A thin layer (8–10 µm) etches non-ferrous metal (galvanized steel, aluminum, stainless steel, etc.) to promote adhesion.

View in catalog
Etch primer

Acid Solution

Recommended for acid etching of concrete during decontamination; rinse well with water afterward.

Thinner

Xylene

Required for spray application: 20–30% by volume for the first layer, 10% for the second layer.

View in catalog
Cleaner

SAMA chemical 3 in 1 phosphating additive

Cleans oil or grease residues from new steel, diluted 1L:35L water.

Also

BMA SBR

Mixed with water (1:5 by volume) to make the SBR Solution for the cementitious repair mixture.

View in catalog

Packaging, colors & storage

PackagingGallon & Pail kits
ColorsWhite and Tinted (matt finish).
Shelf life1 year from the manufacturing date.
Storage5 °C – 35 °C, humidity ≤ 85%

Store in undamaged, unopened containers. The product must be kept away from direct sunlight and any sources of heat or flame.

Safety & compliance

Environmental Impact

Contains volatile organic compounds (VOCs); avoid release into the environment. Dispose of in accordance with local environmental regulations. Prevent contamination of soil and waterways.

Health Hazards

Harmful by inhalation, skin contact, and if swallowed. May cause allergic skin reactions, respiratory irritation, or eye damage. Prolonged exposure may affect the central nervous system.

Safety Precautions

Use only in well-ventilated areas. Wear appropriate personal protective equipment (PPE) including gloves, goggles, and a respirator. Avoid direct contact with skin and eyes. Do not eat, drink, or smoke while using the product.

First Aid Measures

Inhalation: Move to fresh air; seek medical attention if symptoms persist. Skin Contact: Wash immediately with soap and water. Remove contaminated clothing. Eye Contact: Rinse cautiously with water for several minutes. Seek medical advice. Ingestion: Do not induce vomiting. Rinse mouth and seek immediate medical assistance.

Certifications

ISO 9001:2015ISO 45001:2018ISO 14001:2015
Technical data sheetTDS 4 · Edition 3
Download PDF
Common questions

Questions about BMA Chlorinated Rubber Paint

You can apply the next coat after 24 to 48 hours. The surface is touch dry in 30 minutes to 1 hour.

The theoretical spreading rate is 4.4–6.6 m² per liter at the recommended dry film thickness of 50–75 µm.

Xylene, at 20–30% by volume.

Apply it in a well-ventilated area, with humidity no higher than 75%, and at a temperature between 5 °C and 35 °C.

Request a quote for BMA Chlorinated Rubber Paint

Tell us your project and volumes — our export team replies with pricing and lead times.